List of Contributions

v

Contact Details

v


My Content

1 to 11 of 11 total
Posted By v Jan 19, 2026 06:14:11 AM
Found In Egroup: Networks
\ view thread
in addition to this i have the failing HDD and a acronis .tib format backup image. kind regards -------------------------------------------
Posted By v Jan 19, 2026 06:01:01 AM
Found In Library: Networks
Posted By v Jan 19, 2026 06:01:00 AM
Found In Egroup: Networks
\ view thread
Hi members, I am facing a critical issue with my Allen Bradley industrial PC running a SCADA system on Windows XP; the PC refuses to boot, displaying a "SMART failure predicted on Hard Disk 0: Hitachi" warning at some address, urging an immediate data backup and HDD replacement. The drive contains ...
Posted By v Jan 17, 2026 02:25:20 PM
Found In Egroup: Networks
\ view thread
For the Device Net aspects, using RSNetworx i removed the E1 from the scanlist and replace it with the E300 and set the parameters similar to E1(manually), will this work or do i need to make changes in the plc program? -------------------------------------------
Posted By v Jan 17, 2026 01:37:03 PM
Found In Egroup: Networks
\ view thread
thank you so much for the reply, one more concern is there is e1 overload also placed in this architecture, total 32 nodes 31 e3 and one e1, is there any solution for this. kind regards -------------------------------------------
Posted By v Jan 17, 2026 05:38:00 AM
Found In Egroup: Networks
\ view thread
Hello everyone, I need some guidance on a DeviceNet migration and software‑version strategy. Current system details: Existing DeviceNet network with multiple E3 overload relays Network engineered and maintained using RSNetWorx for DeviceNet v21 Controllers programmed with RSLogix 5000 v16 ...
Posted By v Dec 15, 2025 11:41:30 PM
Found In Egroup: Advanced Software
\ view thread
Thanks for the reply -------------------------------------------
Posted By v Dec 15, 2025 09:15:34 AM
Found In Egroup: Advanced Software
\ view thread
Thank you for the recommendation. Since this is a critical marine system and our team has limited IT background, our priority is to keep the architecture as simple as possible and easy to troubleshoot in case of any issue. We are leaning toward a FactoryTalk View SE distributed solution with redundant ...
Posted By v Dec 15, 2025 08:35:00 AM
Found In Egroup: Advanced Software
\ view thread
We are upgrading an existing system that currently consists of multiple independent HMI and SCADA systems, including main and redundant configurations. Our intention is to retain these as separate projects while enabling centralized visibility from a single remote display station. High availability ...
Posted By v Dec 14, 2025 11:05:00 PM
Found In Egroup: Advanced Software
\ view thread
Hello Everyone, I kindly request your guidance and expert opinions on a system architecture I am currently working with. We have six independent systems (A–F) configured as follows: System A: One main HMI with one redundant HMI System B: One main SCADA with one redundant SCADA System C: One ...